Livestock/Acreage Minimum Requirements |
Property |
Premises
Registration
|
Certifications |
Cost Share $7,500 Maximum |
Cattle - 30 Head
Goats/Sheep - 50 Head
Hay - 50 Acres |
Applicant or
Family Owned |
Required for Livestock Producers |
BQA Beef and Dairy |
Standard
35% |
Master
50% |
Head of livestock = maximum number of single type, regardless of age or sex, at one time during the last 12 months. You can combine goats and sheep to meet 50 head minimum requirement. |
- Approvals will be allocated for the maximum amount. Reimbursements will be based on finished project up to maximum.
- Quotes are not required to request cost share funds.
- It is the applicant's responsibility to ensure that thier project is eligible and meets all TAEP criteria.
- Applicants who received a Hay Storage approval in 2012 are NOT ELIGIBLE to apply for Hay Storage funds in 2013.
|
PROGRAM GOALS: Improve quantity and nutritional quality by using proper storage and management
|
Application Period:
June 1 - June 7, 2013
|
Reimbursement Deadline:
May 1, 2014 |
| Guidelines: use application A to apply, pages 15 - 16 in printed application, application A instructions |
| Eligible Items |
- New structures and additions to existing structures
a. New structures must be a minimum size of 900 square feet - loft or 2nd level will not be considered in the total square footage of the structure
b. Minimum height – 14 ft high clearance for new structures and additions
c. Use of structure must be for hay storage only
d. At least one side/end must be completely open
- Site Preparation - site must be well drained; cost of elevated pad construction is eligible, clearing of land is not eligible
- Roof-metal, shingles, or polymer coated fabric (e.g., Cover-All, Clear Span, Super Structure, etc.)
- Flooring - recommended but not required; 4- 6 inches of gravel on geotextile fabric is eligible for cost share
- Labor conducted by a contractor- Labor provided by applicant or their employees is not eligible
|
|
| Requirements Hay Storage Examples |
| |
Reimbursement maximums per square foot
Approvals will be allocated for the maximum amount. Reimbursements will be based on finished project up to maximum per square foot. |
- 35% Cost Share - Standard Producer
$2.00/ sq. ft. max.
Gravel and site prep - Max $300
Total reimbursement not to exceed $7,500
- 50% Cost Share - Master Producer
$3.00/sq. ft. max.
Gravel and site prep - Max $500
Total reimbursement not to exceed $7,500
|
| Ineligible Items |
|